Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2021, 04:28 PM
  • 29 0630_29 0629_07282021_093417.mp4

Date
07/28/2021
W/O
901244
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01090
PipeID
P24876
Time
9:28 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9089
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
WO_901244_TV29015_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0629
Downstream MH
29 0630
Dir. of Survey
Upstream
Length Surveyed
103.7 ft.
Total Length
103.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 29 0629 to 29 0630
MH: 29 0629MH: 29 0630upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 063022.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"53.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"103.7 ft. MWM - Water Mark, 5 %of cross sectional area103.7 ft. AMH - Downstream Manhole, Survey Begins - 29 0629103.7 ft. MWL - Water Level, 5 %of cross sectional area

Observations (6)

DistanceCodeObservation
49.8TF
0MWM
103.7AMH29 0630
0AMH29 0629
81.5TF
0MWL

Properties (7)

additional_info
630074072821052
custom_field_three
NO SEVERE DEFECTS
custom_field_two
4
customer
1
datetime
2021-07-28T09:28:24-07:00
documentation
PROPIPE
is_lateral_inspection
false