Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2021, 04:15 PM
  • 29 0627_29 0626_07282021_091901.mp4

Date
07/28/2021
W/O
901244
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01090
PipeID
P24873
Time
9:15 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9089
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
WO_901244_TV29015_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0626
Downstream MH
29 0627
Dir. of Survey
Upstream
Length Surveyed
55.1 ft.
Total Length
55.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 29 0626 to 29 0627
MH: 29 0626MH: 29 0627upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 062750.9 ft. FL - Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES55.1 ft. MWL - Water Level, 5 %of cross sectional area55.1 ft. AMH - Downstream Manhole, Survey Begins - 29 062655.1 ft. MWM - Water Mark, 5 %of cross sectional area

Observation photos (1)

  • Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES

    4.2 ft. - Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES

Observations (5)

DistanceCodeObservation
0MWL
4.2FL
0AMH29 0626
0MWM
55.1AMH29 0627

Properties (7)

additional_info
630074072821052
custom_field_three
NO SEVERE DEFECTS
custom_field_two
4
customer
1
datetime
2021-07-28T09:15:33-07:00
documentation
PROPIPE
is_lateral_inspection
false