Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 2, 2021, 01:50 PM
  • 29 0657_29 0656_08022021_065951.mp4

Date
08/02/2021
W/O
901244
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01090
PipeID
P24904
Time
6:50 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9091
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
WO_901244_TV29015_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0656
Downstream MH
29 0657
Dir. of Survey
Upstream
Length Surveyed
133.1 ft.
Total Length
133.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 29 0656 to 29 0657
MH: 29 0656MH: 29 0657upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 06575.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"12.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"51 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"58.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"95.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"108.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.1 ft. MWL - Water Level, 5 %of cross sectional area133.1 ft. AMH - Downstream Manhole, Survey Begins - 29 0656133.1 ft. MWM - Water Mark, 10 %of cross sectional area

Observations (11)

DistanceCodeObservation
133.1AMH29 0657
37.5TF
0MWL
127.8TF
74.5TF
82.1TF
8.2TF
0AMH29 0656
0MWM
120.4TF
24.7TF

Properties (7)

additional_info
630074080221022
custom_field_three
NO SEVERE DEFECTS
custom_field_two
4
customer
1
datetime
2021-08-02T06:50:19-07:00
documentation
PROPIPE
is_lateral_inspection
false