Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 9, 2021, 05:56 AM
  • 22 0565_22 0564_09082021_230821.mp4

Date
09/08/2021
W/O
911392
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00791
PipeID
P16908
Time
10:56 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9263
Sewer Name
22 BEN LOMOND TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_911392_TV22102_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0565
Downstream MH
22 0564
Dir. of Survey
Downstream
Length Surveyed
211.2 ft.
Total Length
211.2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 22 0565 to 22 0564
MH: 22 0565MH: 22 0564downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 05650 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start7.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"12.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"62.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"67.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"84 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"122.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"137.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"158.3 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6"183.2 ft. LL - Alignment Left, 10 %, Start210.1 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish210.1 ft. LL - Alignment Left, 10 %, Finish211.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0564

Observation photos (2)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Alignment Left, 10 %, Start

    183.2 ft. - Alignment Left, 10 %, Start

Observations (16)

DistanceCodeObservation
183.2LL
0MWL
7.4TFC
84TB
211.2AMH22 0564
158.3TB
0AMH22 0565
0MWM
137.6TFC
2.1SAP
67.6TFC
12.6TFC
122.4TFC
62.6TFC
210.1SAP
210.1LL

Properties (7)

additional_info
630138090821201
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-09-08T22:56:34-07:00
documentation
PROPIPE
is_lateral_inspection
false