Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 9, 2021, 08:49 AM
  • 22 0534_22 0568_09092021_020156.mp4

Date
09/09/2021
W/O
911392
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00791
PipeID
P16875
Time
1:49 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9263
Sewer Name
22 BEN LOMOND TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_911392_TV22102_SEP2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0534
Downstream MH
22 0568
Dir. of Survey
Downstream
Length Surveyed
264.1 ft.
Total Length
264.1 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
156
O&M Index
2
O&M Quick
2B00
O&M Rating
30
Overall Index
3
Overall Quick
Overall Rating
186
Pipe schematic from manhole 22 0534 to 22 0568
MH: 22 0534MH: 22 0568downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 05342.3 ft. MGO - General Observation - MAG COATING2.3 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start35.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"39.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"83.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"87.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"115.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 4"135.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"183.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"188.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4", 4"189.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start232.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"236.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"262.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish262.2 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish264.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0568264.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    189.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
135.6TFC
188.1TFC
264.1AMH22 0568
264.1MGOCONNECTION AT MH 9 O'CLOCK
183.9TFC
0MWM
87.3TFC
262.2DAGS
236.3TFC
35.4TFC
232.5TFC
0MWL
0AMH22 0534
115.4TFC
83.4TFC
2.3MGOMAG COATING
189.5DAGS
2.3SAP
262.2SAP
39.4TFA

Properties (7)

additional_info
630138090821201
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-09-09T01:49:17-07:00
documentation
PROPIPE
is_lateral_inspection
false