Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2021, 07:11 AM
  • B 0613_B 0612_08192021_003051.mp4

Date
08/19/2021
W/O
906780
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00105
PipeID
P09185
Time
12:11 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9259
Sewer Name
B JOINT OUTFALL B - UNIT 8B
City
TEMPLE CITY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_906780_TV15227_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
21 in.
Upstream MH
B 0613
Downstream MH
B 0612
Dir. of Survey
Downstream
Length Surveyed
365.9 ft.
Total Length
365.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole B 0613 to B 0612
MH: B 0613MH: B 0612downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 06130 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 45 %of cross sectional area3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. MGO - General Observation - MAG COATING11.9 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start29 ft. MGO - General Observation - CAMERA UNSTABLE DUE TO DEBRIS164.3 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 4"364.3 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish364.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish365.9 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK365.9 ft. AMH - Downstream Manhole, Survey Ends - B 0612

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MWL
0AMHB 0613
364.3DSC
11.9DSC
365.9MGOCONNECTION AT MH 9 O'CLOCK
164.3TB
365.9AMHB 0612
3SAP
364.3SAP
29MGOCAMERA UNSTABLE DUE TO DEBRIS
0MGOCONNECTION AT MH 3 O'CLOCK
0MWM
3MGOMAG COATING

Properties (7)

additional_info
630138081821212
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-08-19T00:11:44-07:00
documentation
PROPIPE
is_lateral_inspection
false