Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2021, 07:32 AM
  • B 0612_B 0611_08192021_005009.mp4

Date
08/19/2021
W/O
906780
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00105
PipeID
P09184
Time
12:32 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9259
Sewer Name
B JOINT OUTFALL B - UNIT 8B
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_906780_TV15227_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
21 in.
Upstream MH
B 0612
Downstream MH
B 0611
Dir. of Survey
Downstream
Length Surveyed
364 ft.
Total Length
364 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole B 0612 to B 0611
MH: B 0612MH: B 0611downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 06122.4 ft. MGO - General Observation - MAG COATING12.8 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - UNDER FLOW12.8 ft. MGO - General Observation - CAMERA UNSTABLE DUE TO DEBRIS91 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start148.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES148.1 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 8"265.9 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"265.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start339.4 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"362.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish362.4 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish362.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish363.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK364 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK364 ft. AMH - Downstream Manhole, Survey Ends - B 0611

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    91 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    148.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    265.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
364MGOCONNECTION AT MH 9 O'CLOCK
265.9TBA
364AMHB 0611
2.4MGOMAG COATING
148.1SAP
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
362.4SAP
0MWL
91SAV
362.4DSC
12.8DSCUNDER FLOW
148.1TB
339.4TBA
363.7MGOCONNECTION AT MH 3 O'CLOCK
362.4SAV
12.8MGOCAMERA UNSTABLE DUE TO DEBRIS
265.9SAP
0AMHB 0612

Properties (7)

additional_info
630138081821212
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-08-19T00:32:36-07:00
documentation
PROPIPE
is_lateral_inspection
false