Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2021, 09:12 AM
  • B 0603_B 0602_08192021_023159.mp4

Date
08/19/2021
W/O
906780
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00105
PipeID
P09175
Time
2:12 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9259
Sewer Name
B JOINT OUTFALL B - UNIT 8B
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_906780_TV15227_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
24 in.
Upstream MH
B 0603
Downstream MH
B 0602
Dir. of Survey
Downstream
Length Surveyed
328.1 ft.
Total Length
328.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole B 0603 to B 0602
MH: B 0603MH: B 0602downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 06030 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area6.4 ft. MGO - General Observation - MAG COATING142.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"328.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK328.1 ft. AMH - Downstream Manhole, Survey Ends - B 0602

Observations (8)

DistanceCodeObservation
0MWM
142.7TB
0AMHB 0603
328.1MGOCONNECTION AT MH 9 O'CLOCK
6.4MGOMAG COATING
328.1AMHB 0602
0MGOCONNECTION AT MH 9 O'CLOCK
0MWL

Properties (7)

additional_info
630138081821212
custom_field_three
MAG COATING COVERING PIPE
custom_field_two
3
customer
1
datetime
2021-08-19T02:12:24-07:00
documentation
PROPIPE
is_lateral_inspection
false