G 0318_G 0317_9222021_033754.mp4
0 ft. - General Observation - 80% MAG COAT START
2 ft. - General Observation - 50% MISSING TILES START
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR CORRODED MISSING
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
27.3 ft. - Surface Reinforcement Corroded, from 09 to 12 o'clock, within 8 inches of joint: NO - BROKEN REBAR
77.6 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CORRODED MISSING REBAR
| Distance | Code | Observation |
|---|---|---|
| 2 | MGO | 50% MISSING TILES START |
| 95.3 | SAM | SEVERE AGG |
| 95.3 | SRC | LONG CIRCUM REBAR CORRODED MISSING |
| 95.3 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 77.6 | SRC | CORRODED MISSING REBAR |
| 27.3 | SRC | BROKEN REBAR |
| 95.3 | MGO | 50% MISSING TILES FINISH |
| 0 | MGO | 80% MAG COAT START |
| 95.3 | MGO | 80% MAG COAT FINISH |
| 0 | AMH | 3:35AM |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SRC | LONG CIRCUM REBAR CORRODED MISSING |
| 0 | MWM | — |
| 0 | MWL | — |
| 95.3 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SAM | SEVERE AGG |
| 95.9 | AMH | 3:50AM |