Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 13, 2021, 07:40 AM
  • G 0154_G 0153_9132021_020956.mp4

Date
09/13/2021
W/O
0901320
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01180
PipeID
P01477
Time
12:40 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1940
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
17
Purpose
Capital Improvement Program Assesment
Project
20210913MDM_JOINT_OUTFALL_G_UNIT_8
Material
RCP-CTL
Shape
Circular
Height
36 in.
Upstream MH
G 0154
Downstream MH
G 0153
Dir. of Survey
Downstream
Length Surveyed
10.6 ft.
Total Length
10.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole G 0154 to G 0153
MH: G 0154MH: G 0153downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:10AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MGO - General Observation - TILES 00% IN PLACE UNDER MAG GREASE COAT2 ft. MGO - General Observation - GREASEW MAG COAT 99% START10 ft. MGO - General Observation - SHORT CUT TILE ROW MISSING AT DOWNSTREAM SOFFIT10 ft. MGO - General Observation - TILES 100% IN PLACE FINISH10 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active LARGE INCOMING10 ft. MGO - General Observation - MAG GREASE COAT 99% FINISH10.6 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM

Observation photos (3)

  • General Observation - TILES 00% IN PLACE UNDER MAG GREASE COAT

    2 ft. - General Observation - TILES 00% IN PLACE UNDER MAG GREASE COAT

  • General Observation - GREASEW MAG COAT 99% START

    2 ft. - General Observation - GREASEW MAG COAT 99% START

  • General Observation - SHORT CUT TILE ROW MISSING AT DOWNSTREAM SOFFIT

    10 ft. - General Observation - SHORT CUT TILE ROW MISSING AT DOWNSTREAM SOFFIT

Observations (11)

DistanceCodeObservation
10MGOSHORT CUT TILE ROW MISSING AT DOWNSTREAM SOFFIT
10MGOTILES 100% IN PLACE FINISH
10MGOConn. @ Mh, 9 O' Clock. Active LARGE INCOMING
10MGOMAG GREASE COAT 99% FINISH
10.6AMH2:15AM
0AMH2:10AM
2MGOTILES 00% IN PLACE UNDER MAG GREASE COAT
0MWM
0MGOConn. @ Mh, 9 O' Clock. Active
2MGOGREASEW MAG COAT 99% START
0MWL

Properties (6)

custom_field_three
100% BTILES IN PLACE UNDER MAG GREASE COAT
custom_field_two
3
customer
LACSD
datetime
2021-09-13T00:40:03-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false