Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2021, 06:46 AM
  • H 0992_H 0991_08132021_000355.mp4

Date
08/12/2021
W/O
906779
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01005
PipeID
P15406
Time
11:46 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9117
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_906779_TV21087_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0992
Downstream MH
H 0991
Dir. of Survey
Downstream
Length Surveyed
446.1 ft.
Total Length
446.1 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
440
O&M Index
2
O&M Quick
2Q00
O&M Rating
178
Overall Index
2
Overall Quick
Overall Rating
618
Pipe schematic from manhole H 0992 to H 0991
MH: H 0992MH: H 0991downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 09920 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 60% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start94.6 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"200.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"304.5 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 8" - OPEN400.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8" - OPEN444 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish444 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish444 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish446 ft. MGO - General Observation - ROACHES @ MH446.1 ft. AMH - Downstream Manhole, Survey Ends - H 0991

Observation photos (6)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 60% MAG COAT

    2 ft. - General Observation - 60% MAG COAT

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"

    94.6 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"

  • Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"

    200.2 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"

  • Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 8" - OPEN

    304.5 ft. - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 8" - OPEN

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8" - OPEN

    400.9 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8" - OPEN

Observations (17)

DistanceCodeObservation
444DAGS
444SSS
446MGOROACHES @ MH
304.5TBCOPEN
0AMHH 0992
0MGOROACHES @ MH
444SAV
400.9TFOPEN
2SAV
2SSS
2MGO60% MAG COAT
94.6TBA
200.2TFC
2DAGS
0MWL
0MWM
446.1AMHH 0991

Properties (7)

additional_info
630138081221201
custom_field_three
MAG COAT, SPALLING
custom_field_two
3
customer
1
datetime
2021-08-12T23:46:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false