Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2021, 04:28 PM
  • H 0985_H 0984_08162021_094735.mp4

Date
08/16/2021
W/O
906779
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01005
PipeID
P15398
Time
9:28 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9254
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_906779_TV21087_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0985
Downstream MH
H 0984
Dir. of Survey
Downstream
Length Surveyed
400.1 ft.
Total Length
400.1 ft.
Structural Index
2
Structural Quick
3L2O
Structural Rating
353
O&M Index
2
O&M Quick
2O00
O&M Rating
158
Overall Index
2
Overall Quick
Overall Rating
511
Pipe schematic from manhole H 0985 to H 0984
MH: H 0985MH: H 0984downstream0 ft. AMH - Upstream Manhole, Survey Begins - H09850 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - UNDER MAG COATING6.6 ft. MGO - General Observation - 75% MAG COAT74.3 ft. SAV - Surface Aggregate Visible, at 10 o'clock, within 8 inches of joint: NO78.3 ft. SAP - Surface Aggregate Projecting, from 01 to 04 o'clock, within 8 inches of joint: NO85.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start103.3 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4", 6"346.9 ft. MGP - General Photograph - SPALLING346.9 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 4", 4"398 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish398.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish398.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish400.1 ft. AMH - Downstream Manhole, Survey Ends - H 0984

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - UNDER MAG COATING

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - UNDER MAG COATING

  • Surface Aggregate Visible, at 10 o'clock, within 8 inches of joint: NO

    74.3 ft. - Surface Aggregate Visible, at 10 o'clock, within 8 inches of joint: NO

  • Surface Aggregate Projecting, from 01 to 04 o'clock, within 8 inches of joint: NO

    78.3 ft. - Surface Aggregate Projecting, from 01 to 04 o'clock, within 8 inches of joint: NO

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    85.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - SPALLING

    346.9 ft. - General Photograph - SPALLING

Observations (18)

DistanceCodeObservation
398.6SSS
0AMHH0985
2DAGS
0MGOROACHES @ MH
6.6MGO75% MAG COAT
400.1AMHH 0984
0MWM
103.3TFA
78.3SAP
74.3SAV
398.6SAV
346.9MGPSPALLING
0MWL
398DAGS
346.9TFA
2SSSUNDER MAG COATING
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
85.8SAV

Properties (7)

additional_info
630138081621061
custom_field_three
SPALLING, AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-08-16T09:28:57-07:00
documentation
PROPIPE
is_lateral_inspection
false