Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 25, 2021, 10:25 AM
  • E 0123_E 0122_08252021_033632.mp4

Date
08/25/2021
W/O
906758
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00032
PipeID
P11349
Time
3:25 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9335
Sewer Name
E JOINT OUTFALL E - UNIT 5
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_906758_TV01282_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Rectangular
Height
30 in.
Width
30 in.
Upstream MH
E 0123
Downstream MH
E 0122
Dir. of Survey
Downstream
Length Surveyed
397.2 ft.
Total Length
397.2 ft.
Structural Index
3
Structural Quick
5O3O
Structural Rating
783
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
783
Pipe schematic from manhole E 0123 to E 0122
MH: E 0123MH: E 0122downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 01230 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK CAPPED0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start397.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish397.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish397.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish397.2 ft. AMH - Downstream Manhole, Survey Ends - E 0122

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.2 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
6.2SRV
0AMHE 0123
0MWM
397.2SRV
2.1SAP
0MWL
397.2SSS
397.2SAP
6.2SSS
0MGOCONNECTION AT THE MH 3 OC'LOCK CAPPED
0MGOCONNECTION AT THE MH 9 OC'LOCK
397.2AMHE 0122

Properties (8)

additional_info
630074082421205
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-08-25T03:25:40-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
31869