Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 25, 2021, 09:30 AM
  • E 0103_E 0102_08252021_023841.mp4

Date
08/25/2021
W/O
906770
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00031
PipeID
P11330
Time
2:30 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9334
Sewer Name
E JOINT OUTFALL E - UNIT 4 RELOCATION
City
WATTS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_906770_TV01089_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
E 0103
Downstream MH
E 0102
Dir. of Survey
Downstream
Length Surveyed
66.3 ft.
Total Length
66.3 ft.
Structural Index
3
Structural Quick
5B3B
Structural Rating
130
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
130
Pipe schematic from manhole E 0103 to E 0102
MH: E 0103MH: E 0102downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 01030 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWM - Water Mark, 35 %of cross sectional area2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start66.3 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK66.3 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish66.3 ft. AMH - Downstream Manhole, Survey Ends - E 010266.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish66.3 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK66.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2.1SSS
66.3MGOCONNECTION AT THE MH 9 OC'LOCK
66.3SRV
0MWL
2.1SAP
2.1SRV
0AMHE 0103
66.3AMHE 0102
0MGOCONNECTION AT THE MH 3 OC'LOCK
66.3SAP
66.3MGOCONNECTION AT THE MH 3 OC'LOCK
66.3SSS
0MWM

Properties (8)

additional_info
630074082421204
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-08-25T02:30:46-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
30530