Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 25, 2021, 09:39 AM
  • E 0102_E 0101_08252021_024305.mp4

Date
08/25/2021
W/O
906770
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00031
PipeID
P11329
Time
2:39 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9334
Sewer Name
E JOINT OUTFALL E - UNIT 4 RELOCATION
City
WATTS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_906770_TV01089_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
E 0102
Downstream MH
E 0101
Dir. of Survey
Downstream
Length Surveyed
37.7 ft.
Total Length
37.7 ft.
Structural Index
3
Structural Quick
5737
Structural Rating
70
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
70
Pipe schematic from manhole E 0102 to E 0101
MH: E 0102MH: E 0101downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - E 01022.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish37.7 ft. AMH - Downstream Manhole, Survey Ends - E 010137.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish37.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish37.7 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK

Observation photos (3)

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MWM
0MGOCONNECTION AT THE MH 9 OC'LOCK
2.1SRV
37.7SSS
0MWL
0MGOCONNECTION AT THE MH 3 OC'LOCK
37.7AMHE 0101
37.7SAP
37.7SRV
2.1SSS
0AMHE 0102
37.7MGOCONNECTION AT THE MH 3 OC'LOCK
2.1SAP

Properties (8)

additional_info
630074082421204
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-08-25T02:39:21-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
30530