Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 18, 2021, 09:41 AM
  • 01 1198_01 1155_08182021_024938.mp4

Date
08/18/2021
W/O
906159
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00226
PipeID
P02108
Time
2:41 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9327
Sewer Name
01 WILCOX AVENUE TRUNK, EXTENSION #1
City
CUDAHY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_906159_TV01250_AUG2021
Sewer Type
Gravity
Material
CIP
Shape
Circular
Height
16 in.
Width
15 in.
Upstream MH
01 1198
Downstream MH
01 1155
Dir. of Survey
Downstream
Length Surveyed
86.5 ft.
Total Length
86.5 ft.
Structural Index
2
Structural Quick
3B2B
Structural Rating
80
O&M Index
2
O&M Quick
2B00
O&M Rating
32
Overall Index
2
Overall Quick
Overall Rating
112
Pipe schematic from manhole 01 1198 to 01 1155
MH: 01 1198MH: 01 1155downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 11980 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. MMC - Material Change, Vitrified clay pipe10.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start36.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"69 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start69 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start69 ft. MMC - Material Change, Other (state in comments) - CIP84 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish84 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish85 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish86.5 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish86.5 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE86.5 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish86.5 ft. MGO - General Observation - CONN @ MH 12 O'CLOCK/UNKNOWN86.5 ft. AMH - Downstream Manhole, Survey Ends - 01 1155

Observation photos (4)

  • Material Change, Vitrified clay pipe

    2.1 ft. - Material Change, Vitrified clay pipe

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    69 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    69 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
69SRI
10.1CM
0AMH01 1198
69SCP
2SSS
85CM
86.5SCP
0MWL
86.5MGOCONN @ MH 3 O'CLOCK/ACTIVE
86.5SRI
86.5MGOCONN @ MH 12 O'CLOCK/UNKNOWN
86.5AMH01 1155
36.5TFC
2.1MMC
84SSS
0MWM
2DAGS
0MGOROACHES @ MH
69MMCCIP
84DAGS

Properties (7)

additional_info
630074081721204
custom_field_three
CRACKS/ SURFACE CORROSION METAL PIPE
custom_field_two
2
customer
1
datetime
2021-08-18T02:41:07-07:00
documentation
PROPIPE
is_lateral_inspection
false