Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 29, 2021, 05:34 AM
  • A 0729_A 0728_07282021_223849.mp4

Date
07/28/2021
W/O
901661
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00314
PipeID
P07633
Time
10:34 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8690
Sewer Name
A JOA-1A CHINO BASIN WASTEWATER LINE
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
19
Purpose
Routine Assessment
Project
WO_901661_TV21024_JUL2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
15 in.
Upstream MH
A 0729
Downstream MH
A 0728
Dir. of Survey
Downstream
Length Surveyed
12.9 ft.
Total Length
12.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole A 0729 to A 0728
MH: A 0729MH: A 0728downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 07290 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area3.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.3 ft. MGO - General Observation - MAG COATING11.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish12.9 ft. AMH - Downstream Manhole, Survey Ends - A 0728

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
3.3DAGS
0AMHA 0729
3.3MGOMAG COATING
11.6DAGS
0MWL
0MWM
12.9AMHA 0728

Properties (7)

additional_info
630138072821201
custom_field_three
MAG COATING COVERING PIPE
custom_field_two
5
customer
1
datetime
2021-07-28T22:34:13-07:00
documentation
PROPIPE
is_lateral_inspection
false