Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 28, 2021, 08:55 AM
  • A 0736_A 0735_07282021_020146.mp4

Date
07/28/2021
W/O
901661
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00314
PipeID
P07640
Time
1:55 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8689
Sewer Name
A JOA-1A CHINO BASIN WASTEWATER LINE
City
POMONA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
19
Purpose
Routine Assessment
Project
WO_901661_TV21024_JUL2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
15 in.
Upstream MH
A 0736
Downstream MH
A 0735
Dir. of Survey
Downstream
Length Surveyed
102.6 ft.
Total Length
102.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole A 0736 to A 0735
MH: A 0736MH: A 0735downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 07360 ft. MWL - Water Level, 20 %of cross sectional area3.2 ft. MGO - General Observation - MAG COATING3.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start100.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish102.6 ft. AMH - Downstream Manhole, Survey Ends - A 0735

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
0AMHA 0736
100.4DAGS
0MWL
3.2MGOMAG COATING
102.6AMHA 0735
3.2DAGS

Properties (7)

additional_info
630138072721201
custom_field_three
MAG COATING COVERING PIPE
custom_field_two
5
customer
1
datetime
2021-07-28T01:55:00-07:00
documentation
PROPIPE
is_lateral_inspection
false