Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2021, 07:04 AM
  • A 0753_A 0752_07272021_002059.mp4

Date
07/27/2021
W/O
901661
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00314
PipeID
P07657
Time
12:04 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8688
Sewer Name
A JOA-1A CHINO BASIN WASTEWATER LINE
City
POMONA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
20
Purpose
Routine Assessment
Project
WO_901661_TV21024_JUL2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
18 in.
Upstream MH
A 0753
Downstream MH
A 0752
Dir. of Survey
Downstream
Length Surveyed
535.3 ft.
Total Length
535.3 ft.
Structural Index
1
Structural Quick
1100
Structural Rating
1
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
3
Pipe schematic from manhole A 0753 to A 0752
MH: A 0753MH: A 0752downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK CAPPED0 ft. AMH - Upstream Manhole, Survey Begins - A 07532.3 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COATING533.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish533.3 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish535.3 ft. AMH - Downstream Manhole, Survey Ends - A0752

Observation photos (2)

  • Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MWM
535.3AMHA0752
2.3SRI
2.3DAGS
2.3MGOMAG COATING
533.3DAGS
533.3SRI
0MWL
0MGOCONNECTION AT MH 3 O'CLOCK CAPPED
0AMHA 0753

Properties (7)

additional_info
630138072621201
custom_field_three
MAG COATING COVERING PIPE
custom_field_two
5
customer
1
datetime
2021-07-27T00:04:06-07:00
documentation
PROPIPE
is_lateral_inspection
false