- Date
- 09/01/2021
- W/O
- 0913880
- Weather
- Dry
- Operator/Surveyor
- MARTIN
- Sewer ID
- Z01213
- PipeID
- P26450
- Time
- 1:50 AM
- Certificate
- U-1014-06022543
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H1932
- Sewer Name
- 27 DISTRICT #27 GRAVITY SEWER
- City
- MALIBU
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 27
- Page No.
- 01
- Purpose
- Maintenance Related
- Project
- 20210901MDM_DISTRICT_27_GRAVITY_SEWER
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 10 in.
- Upstream MH
- 27 0011
- Downstream MH
- 27 0012
- Dir. of Survey
- Upstream
- Length Surveyed
- 216.9 ft.
- Total Length
- 216.9 ft.
- Structural Index
- 5
- Structural Quick
- 5500
- Structural Rating
- 25
- O&M Index
- 2
- O&M Quick
- 2100
- O&M Rating
- 2
- Overall Index
- 5
- Overall Quick
- —
- Overall Rating
- 27
Pipe schematic from manhole 27 0011 to 27 0012 Observation photos (6)

30.9 ft. - Hole Void Visible, from 07 to 02 o'clock, within 8 inches of joint: YES - STEEL PLATE ON STREET

30.9 ft. - Hole Void Visible, from 07 to 02 o'clock, within 8 inches of joint: YES - TOP OF VOID

30.9 ft. - Hole Void Visible, from 08 to 02 o'clock, within 8 inches of joint: YES

30.9 ft. - General Photograph - HOLE IN PIPE

30.9 ft. - Hole Void Visible, from 07 to 01 o'clock, within 8 inches of joint: YES

31.9 ft. - Hole Void Visible, from 07 to 02 o'clock, within 8 inches of joint: YES - APPOX 1 FOOT LENGTH OF VOID