30 0039_30 0038_9102021_012244.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 90% START
15.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
153.7 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
221.2 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - ROCKS SLUDGE
315.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 15.4 | SAM | SEVERE AGG |
| 153.7 | SAM | SEVERE AGG |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SAM | SEVERE AGG |
| 245.8 | DSZ | ROCKS SLUDGE |
| 330.2 | MGO | 90% MAG COAT FINISH |
| 0 | MWM | — |
| 330.8 | AMH | 1:50AM |
| 221.2 | DSZ | ROCKS SLUDGE |
| 330.2 | SSS | BLISTERING PEELING CONCRETE |
| 315.8 | SAM | SEVERE AGG |
| 330.2 | SAM | SEVERE AGG |
| 0 | MWL | — |
| 0 | AMH | 1:20AM |
| 2 | MGO | MAG COAT 90% START |