2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR BROKEN- NO LONGER THERE
2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
13.4 ft. - General Observation - 75% MAG COAT START
24.8 ft. - Deposits Settled Other, 70 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: NO, Start - POSSIBLE PAPER PRODUCTS UNDER FLOW
36 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
44.6 ft. - Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG
57 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
74.9 ft. - Deposits Settled Other, 70 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: NO - PAPER
97 ft. - General Observation - 20% MAG COAT START
115 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
160.1 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
202.2 ft. - General Observation - 20% MAG COAT FIMISH
313 ft. - Deposits Settled Other, 70 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: NO - PAPER-SLUDGE
364.7 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE
382.5 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
| Distance | Code | Observation |
|---|---|---|
| 74.9 | DSZ | PAPER |
| 48.9 | SAV | FINISH |
| 0 | MGO | MH CONN 3:00 ACTIVE |
| 0 | MWM | — |
| 364.7 | SSS | BLISTERING PEELING CONCRETE |
| 57 | SRV | CIRCUM REBAR |
| 402.2 | DSZ | PAPER SLUDGE |
| 36 | SSS | BLISTERING PEELING CONCRETE |
| 97 | MGO | 20% MAG COAT START |
| 313 | DSZ | PAPER-SLUDGE |
| 402.2 | SSS | BLISTERING PEELING CONCRETE |
| 115 | SSS | PEELING CONCRETE |
| 2 | SRC | CIRCUM REBAR BROKEN- NO LONGER THERE |
| 382.5 | SAV | SEVERE AGG SPORATIC |
| 24.8 | DSZ | POSSIBLE PAPER PRODUCTS UNDER FLOW |
| 402.8 | AMH | 4:15AM |
| 0 | MWL | — |
| 0 | AMH | 3:15AM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 13.4 | MGO | 75% MAG COAT START |
| 44.6 | SAV | SEVERE AGG |
| 160.1 | SRC | CIRCUM REBAR |
| 202.2 | MGO | 20% MAG COAT FIMISH |