Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 17, 2021, 09:37 AM
  • 05 1398_05 1397_08172021_025410.mp4

Date
08/17/2021
W/O
906612
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00487
PipeID
P06619
Time
2:37 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9323
Sewer Name
05 MONETA TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_906612_TV05336_AUG2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
18 in.
Upstream MH
05 1398
Downstream MH
05 1397
Dir. of Survey
Downstream
Length Surveyed
322.7 ft.
Total Length
322.7 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
192
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
192
Pipe schematic from manhole 05 1398 to 05 1397
MH: 05 1398MH: 05 1397downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - 05 13980 ft. MWM - Water Mark, 35 %of cross sectional area2.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start61.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"92.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"150.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"199 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"235 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"286.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"320.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.7 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK322.7 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK322.7 ft. AMH - Downstream Manhole, Survey Ends - 05 1397

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
286.3TFC
0MGOCONNECTION AT THE MH 9 OC'LOCK
322.7MGOCONNECTION AT THE MH 3 OC'LOCK
199TF
92.4TF
150.7TFC
0MWL
235TFC
0MGOCONNECTION AT THE MH 3 OC'LOCK
0AMH05 1398
322.7MGOCONNECTION AT THE MH 9 OC'LOCK
322.7AMH05 1397
61.4TFC
2.3CM
320.4CM
0MWM

Properties (7)

additional_info
630074081621203
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-08-17T02:37:57-07:00
documentation
PROPIPE
is_lateral_inspection
false