Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2021, 06:59 AM
  • 22 0967_22 0966_08102021_001514.mp4

Date
08/09/2021
W/O
906375
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00790
PipeID
P17337
Time
11:59 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9111
Sewer Name
22 BASE LINE TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_906375_TV22002_AUG2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0967
Downstream MH
22 0966
Dir. of Survey
Downstream
Length Surveyed
376.8 ft.
Total Length
376.8 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0967 to 22 0966
MH: 22 0967MH: 22 0966downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 09670 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start56.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS153.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS214.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"266.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS319.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS364 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS374.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish374.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish376.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0966

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
153.5TFCDEBRIS
364TFDEBRIS
0MWL
374.1SSS
2MGOMAG COAT
56.4TFCDEBRIS
266.8TFDEBRIS
0AMH22 0967
2SSS
0MWM
374.1SAV
214.2TF
319.1TFCDEBRIS
2SAV
376.8AMH22 0966

Properties (7)

additional_info
630138080921201
custom_field_three
SPALLING, AGGREGATE VISIBLE, MAG COAT
custom_field_two
3
customer
1
datetime
2021-08-09T23:59:36-07:00
documentation
PRO PIPE
is_lateral_inspection
false