Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2021, 04:54 AM
  • 22 0966_22 0965_08092021_221615.mp4

Date
08/09/2021
W/O
906375
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00790
PipeID
P17336
Time
9:54 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9111
Sewer Name
22 BASE LINE TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_906375_TV22002_AUG2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0966
Downstream MH
22 0965
Dir. of Survey
Downstream
Length Surveyed
396 ft.
Total Length
396 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0966 to 22 0965
MH: 22 0966MH: 22 0965downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 09660 ft. MWL - Water Level, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"63 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6" - debris71.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS120.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS124.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS164.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS172.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS217.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS225.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS269.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"274.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS318.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS323 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS393.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish393.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish396 ft. AMH - Downstream Manhole, Survey Ends - 22 0965396 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
323TFDEBRIS
120.6TFDEBRIS
225.6TFDEBRIS
71.1TFDEBRIS
217.5TFDEBRIS
124.5TFDEBRIS
393.7SAV
7SSS
2MGOMAG COAT
396AMH22 0965
0MWM
164.4TFDEBRIS
172.9TFDEBRIS
318.4TFCDEBRIS
22.5TF
0AMH22 0966
0MWL
396MGOCONNECTION AT MH 9 O'CLOCK
269.8TFA
393.7SSS
274.8TFDEBRIS
63TFdebris
2SAV

Properties (7)

additional_info
630138080921201
custom_field_three
SPALLING, AGGREGATE VISIBLE, MAG COAT
custom_field_two
3
customer
1
datetime
2021-08-09T21:54:01-07:00
documentation
PRO PIPE
is_lateral_inspection
false