Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 26, 2021, 06:29 PM
  • 29 0451_29 0450_07262021_114452.mp4

Date
07/26/2021
W/O
901245
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01090
PipeID
P24491
Time
11:29 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9084
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
WO_901245_TV29013_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0450
Downstream MH
29 0451
Dir. of Survey
Upstream
Length Surveyed
269.8 ft.
Total Length
269.8 ft.
Structural Index
2
Structural Quick
2J00
Structural Rating
106
O&M Index
2
O&M Quick
2J1J
O&M Rating
159
Overall Index
2
Overall Quick
Overall Rating
265
Pipe schematic from manhole 29 0450 to 29 0451
MH: 29 0450MH: 29 0451upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 04510 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN0 ft. RFJ - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish2.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish27.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"76.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"132.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN151.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"184.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"190.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"236.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"241.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"263.5 ft. RFJ - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YES, Start267.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start267.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start269.8 ft. MWL - Water Level, 5 %of cross sectional area269.8 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN269.8 ft. AMH - Downstream Manhole, Survey Begins - 29 0450269.8 ft. MWM - Water Mark, 10 %of cross sectional area

Observation photos (2)

  • Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    6.3 ft. - Roots Fine Joint, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    117.9 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"

Observations (20)

DistanceCodeObservation
2SSS
193.5TFC
267DAGS
117.9TBA
242.7TFA
269.8AMH29 0451
79.7TFC
0MWL
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
2DAGS
27.9TFC
85TFC
0AMH29 0450
33.5TFC
6.3RFJ
0MWM
137.7TFOPEN
269.8MGOCONN @ MH 9 O'CLOCK/OPEN
267SSS
269.8RFJ

Properties (7)

additional_info
630074072621061
custom_field_three
SP[ALLING
custom_field_two
3
customer
1
datetime
2021-07-26T11:29:28-07:00
documentation
PROPIPE
is_lateral_inspection
false