Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 30, 2021, 09:43 AM
  • 29 0399_29 0727_07302021_024743.mp4

Date
07/30/2021
W/O
901245
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01090
PipeID
P24436
Time
2:43 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9109
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
WO_901245_TV29013_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
29 0399
Downstream MH
29 0727
Dir. of Survey
Downstream
Length Surveyed
8.2 ft.
Total Length
8.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 29 0399 to 29 0727
MH: 29 0399MH: 29 0727downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 03990 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES2 ft. LD - Alignment Down, 15 %8.2 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/8.2 ft. AMH - Downstream Manhole, Survey Ends - 29 0727

Observation photos (1)

  • Alignment Down, 15 %

    2 ft. - Alignment Down, 15 %

Observations (8)

DistanceCodeObservation
0AMH29 0399
2DAGS
0MGOROACHES @ MH
0MWL
0MWM
8.2MGOCONN @ MH 9 O'CLOCK/
8.2AMH29 0727
2LD

Properties (6)

custom_field_three
NO STRUCTURAL DEFECTS
custom_field_two
4
customer
1
datetime
2021-07-30T02:43:45-07:00
documentation
PROPIPE
is_lateral_inspection
false