Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2021, 01:26 PM
  • 29 0773_29 0769_07272021_065430.mp4

Date
07/27/2021
W/O
901245
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01090
PipeID
P24673
Time
6:26 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9085
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
WO_901245_TV29013_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0773
Downstream MH
29 0769
Dir. of Survey
Downstream
Length Surveyed
295.7 ft.
Total Length
295.7 ft.
Structural Index
2
Structural Quick
2K00
Structural Rating
116
O&M Index
2
O&M Quick
2K00
O&M Rating
116
Overall Index
2
Overall Quick
Overall Rating
232
Pipe schematic from manhole 29 0773 to 29 0769
MH: 29 0773MH: 29 0769downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 07730 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start45.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN59.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN63.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN84.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN126.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN131.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN155.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN191.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN194.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN203.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN206.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN257.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN289.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN293 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish293 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish295.7 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE295.7 ft. AMH - Downstream Manhole, Survey Ends - 29 0769

Observations (23)

DistanceCodeObservation
191.8TFOPEN
257.8TFOPEN
63.9TFOPEN
295.7MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MWL
289.4TFOPEN
84.4TFOPEN
45.8TFOPEN
194.4TFOPEN
2DAGS
295.7AMH29 0769
0AMH29 0773
2SSS
203.3TFOPEN
131.2TFOPEN
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
126.5TFOPEN
59.4TFOPEN
155.7TFOPEN
293DAGS
0MWM
206.9TFOPEN
293SSS

Properties (7)

additional_info
630074072721051
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-07-27T06:26:44-07:00
documentation
PROPIPE
is_lateral_inspection
false