Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 26, 2021, 05:53 PM
  • 29 0766_29 0765_07262021_110556.mp4

Date
07/26/2021
W/O
901245
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01090
PipeID
P24664
Time
10:53 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9084
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
WO_901245_TV29013_JUL2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0765
Downstream MH
29 0766
Dir. of Survey
Upstream
Length Surveyed
191.3 ft.
Total Length
191.3 ft.
Structural Index
2
Structural Quick
2F00
Structural Rating
74
O&M Index
2
O&M Quick
2F00
O&M Rating
74
Overall Index
2
Overall Quick
Overall Rating
148
Pipe schematic from manhole 29 0765 to 29 0766
MH: 29 0765MH: 29 0766upstream0 ft. ACOM - Cleanout Mainline, Survey Ends - 29 07662.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish50.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN52.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"56.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN69.9 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"116.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"166.9 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6" - OPEN168.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"175.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start189.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start191.3 ft. AMH - Downstream Manhole, Survey Begins - 29 0765191.3 ft. MWL - Water Level, 5 %of cross sectional area191.3 ft. MWM - Water Mark, 10 %of cross sectional area

Observation photos (2)

  • Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    24.4 ft. - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"

    121.4 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"

Observations (16)

DistanceCodeObservation
23.1TFA
24.4TBOPEN
2DAGS
0AMH29 0765
189DAGS
191.3ACOM29 0766
121.4TBA
0MWL
2SSS
140.9TFOPEN
0MWM
134.7TFOPEN
74.6TFC
139TFC
189SSS
16.1TFC

Properties (7)

additional_info
630074072621061
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2021-07-26T10:53:39-07:00
documentation
PROPIPE
is_lateral_inspection
false