Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2021, 05:55 AM
  • E 0046_E 0045_08112021_235458.mp4

Date
08/11/2021
W/O
906380
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00028
PipeID
P11273
Time
10:55 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9313
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_906380_TV01123_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
E 0046
Downstream MH
E 0045
Dir. of Survey
Downstream
Length Surveyed
279.2 ft.
Total Length
279.2 ft.
Structural Index
3
Structural Quick
5C3J
Structural Rating
347
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
347
Pipe schematic from manhole E 0046 to E 0045
MH: E 0046MH: E 0045downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00462.1 ft. MGO - General Observation - MAG COAT3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start65 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start151.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish279.2 ft. AMH - Downstream Manhole, Survey Ends - E 0045279.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish279.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    22 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    65 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
151.2SRV
279.2AMHE 0045
0MWL
2.1MGOMAG COAT
65SSS
279.2SSS
279.2SAV
0MWM
3SAV
22SRV
0AMHE 0046

Properties (7)

additional_info
630074081121202
custom_field_three
AGGREGATE VISIBLE/SPALLING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-08-11T22:55:04-07:00
documentation
PROPIPE
is_lateral_inspection
false