Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2021, 06:55 AM
  • E 0045_E 0044_08122021_005014.mp4

Date
08/11/2021
W/O
906380
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00028
PipeID
P11272
Time
11:55 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9313
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_906380_TV01123_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
E 0045
Downstream MH
E 0044
Dir. of Survey
Downstream
Length Surveyed
413.4 ft.
Total Length
413.4 ft.
Structural Index
3
Structural Quick
593O
Structural Rating
453
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
453
Pipe schematic from manhole E 0045 to E 0044
MH: E 0045MH: E 0044downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00450 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area4.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.7 ft. MGO - General Observation - MAG COAT4.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.3 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start60.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish411.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish412.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish413.4 ft. AMH - Downstream Manhole, Survey Ends - E 0044 ZOOMED IN

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.3 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
4.7SAV
0AMHE 0045
60.7SRV
0MWM
0MWL
411.9SSS
14.3SRV
413.4AMHE 0044 ZOOMED IN
4.7MGOMAG COAT
4.7SSS
412.9SAV

Properties (7)

additional_info
630074081121202
custom_field_three
AGGREGATE VISIBLE/SPALLING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-08-11T23:55:07-07:00
documentation
PROPIPE
is_lateral_inspection
false