Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 5, 2021, 08:37 AM
  • 29 0104_29 0103_08052021_015012.mp4

Date
08/05/2021
W/O
906731
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00273
PipeID
P23887
Time
1:37 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9096
Sewer Name
29 33RD STREET SEWER
City
SIGNAL HILL
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_906731_TV29102_AUG2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0103
Downstream MH
29 0104
Dir. of Survey
Upstream
Length Surveyed
224.2 ft.
Total Length
224.2 ft.
Structural Index
3
Structural Quick
513H
Structural Rating
225
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
233
Pipe schematic from manhole 29 0103 to 29 0104
MH: 29 0103MH: 29 0104upstream0 ft. ACOM - Cleanout Mainline, Survey Ends - 29 01040 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish5.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"8.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"17 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN19.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"34.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN70.2 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - 35% GREASE-LATERAL/OPEN93.8 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - CRACKED CONN/OPEN102.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN128.2 ft. B - Broken, from 02 to 04 o'clock, within 8 inches of joint: YES147.3 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN168.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN171.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"216.1 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OFFSET CONN/OPEN218.9 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - BROKEN CONN/OPEN220.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start222.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start224.2 ft. MWL - Water Level, 5 %of cross sectional area224.2 ft. AMH - Downstream Manhole, Survey Begins - 29 0103224.2 ft. MWM - Water Mark, 10 %of cross sectional area224.2 ft. MGO - General Observation - ROACHES @ MH

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    76.9 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Broken, from 02 to 04 o'clock, within 8 inches of joint: YES

    96 ft. - Broken, from 02 to 04 o'clock, within 8 inches of joint: YES

Observations (23)

DistanceCodeObservation
3.8CM
52.8TFC
130.4TFDCRACKED CONN/OPEN
76.9TBOPEN
55.3TFOPEN
8.1TFDOFFSET CONN/OPEN
222SSS
218.3TFC
207.2TFOPEN
5.3TFDBROKEN CONN/OPEN
224.2ACOM29 0104
189.7TFOPEN
0MWL
0AMH29 0103
2SSS
0MWM
224.2CM
0MGOROACHES @ MH
154TFD35% GREASE-LATERAL/OPEN
215.3TFC
121.3TFOPEN
204.8TFC
96B

Properties (7)

additional_info
630074080421202
custom_field_three
MULTIPLE CRACKS/FRACTURE
custom_field_two
3
customer
1
datetime
2021-08-05T01:37:11-07:00
documentation
PROPIPE
is_lateral_inspection
false