Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2021, 02:07 PM
  • 29 0096_29 0095_08102021_074125.mp4

Date
08/10/2021
W/O
906731
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00273
PipeID
P23877
Time
7:07 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8549
Sewer Name
29 33RD STREET SEWER
City
SIGNAL HILL
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_906731_TV29102_AUG2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0095
Downstream MH
29 0096
Dir. of Survey
Upstream
Length Surveyed
250.3 ft.
Total Length
250.3 ft.
Structural Index
3
Structural Quick
524J
Structural Rating
476
O&M Index
2
O&M Quick
2500
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
486
Pipe schematic from manhole 29 0095 to 29 0096
MH: 29 0095MH: 29 0096upstream0 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES0 ft. ACOM - Cleanout Mainline, Survey Ends - 29 00962.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"5.3 ft. FC - Fracture Circumferential, from 10 to 05 o'clock, within 8 inches of joint: YES5.3 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - CRACKED CONN/OPEN9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN37.1 ft. FM - Fracture Multiple, from 07 to 02 o'clock, within 8 inches of joint: YES47.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN49.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES54.7 ft. FM - Fracture Multiple, from 04 to 08 o'clock, within 8 inches of joint: NO62.2 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN98.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"109.5 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OFFSET CONN/OPEN145.6 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - BROKEN CONN/OPEN162.8 ft. CM - Crack Multiple, from 10 to 01 o'clock, within 8 inches of joint: YES165.6 ft. B - Broken, from 05 to 07 o'clock, within 8 inches of joint: YES175.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6"189.2 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, 6ft195.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"215.7 ft. B - Broken, from 03 to 05 o'clock, within 8 inches of joint: YES217.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN240.8 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - BROKEN CONN/OPEN248.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start248.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start248.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start250.3 ft. MGO - General Observation - ROACHES @ MH250.3 ft. AMH - Downstream Manhole, Survey Begins - 29 0095250.3 ft. MWL - Water Level, 10 %of cross sectional area250.3 ft. MWM - Water Mark, 15 %of cross sectional area

Observation photos (10)

  • Broken, from 03 to 05 o'clock, within 8 inches of joint: YES

    34.6 ft. - Broken, from 03 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, 6ft

    61.1 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, 6ft

  • Broken, from 05 to 07 o'clock, within 8 inches of joint: YES

    84.7 ft. - Broken, from 05 to 07 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 10 to 01 o'clock, within 8 inches of joint: YES

    87.5 ft. - Crack Multiple, from 10 to 01 o'clock, within 8 inches of joint: YES

  • Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    188.1 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Fracture Multiple, from 04 to 08 o'clock, within 8 inches of joint: NO

    195.6 ft. - Fracture Multiple, from 04 to 08 o'clock, within 8 inches of joint: NO

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    201.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 02 o'clock, within 8 inches of joint: YES

    213.2 ft. - Fracture Multiple, from 07 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Circumferential, from 10 to 05 o'clock, within 8 inches of joint: YES

    245 ft. - Fracture Circumferential, from 10 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    250.3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (32)

DistanceCodeObservation
34.6B
151.8TFA
2SSS
245FC
74.7TFA
104.7TFDBROKEN CONN/OPEN
140.8TFDOFFSET CONN/OPEN
84.7B
245TFDCRACKED CONN/OPEN
54.7TF
203.1TFOPEN
241.3TFOPEN
87.5CM
248SSS
0MGOROACHES @ MH
201.1FM
188.1TFDOPEN
248CM
248FM
33.2TFOPEN
0AMH29 0095
0MWL
247TFC
2CM
250.3FM
61.1FM
2FM
195.6FM
250.3ACOM29 0096
213.2FM
0MWM
9.5TFDBROKEN CONN/OPEN

Properties (7)

additional_info
630074081021061
custom_field_three
BROKEN/ MULTIPLE FRACTURE
custom_field_two
2
customer
1
datetime
2021-08-10T07:07:40-07:00
documentation
PROPIPE
is_lateral_inspection
false