Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 2, 2021, 08:22 AM
  • 19 0275_19 0274_08022021_020700.mp4

Date
08/02/2021
W/O
906706
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00732
PipeID
P15245
Time
1:22 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8693
Sewer Name
19 209TH STREET TRUNK
City
LAKEWOOD
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_906706_TV19069_AUG2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
19 0275
Downstream MH
19 0274
Dir. of Survey
Downstream
Length Surveyed
410.1 ft.
Total Length
410.1 ft.
Structural Index
3
Structural Quick
4637
Structural Rating
56
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
62
Pipe schematic from manhole 19 0275 to 19 0274
MH: 19 0275MH: 19 0274downstream0 ft. AMH - Upstream Manhole, Survey Begins - 19 02750 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area3.4 ft. CC - Crack Circumferential, from 06 to 03 o'clock, within 8 inches of joint: NO3.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES9.8 ft. FM - Fracture Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES19.1 ft. DSF - Deposits Settled Fine, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start19.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES19.1 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start38 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"47.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"47.2 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish47.2 ft. DSF - Deposits Settled Fine, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish64.4 ft. CS - Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES65.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"67.4 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES86.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.5 ft. FS - Fracture Spiral, from 09 to 10 o'clock, within 8 inches of joint: YES125.1 ft. FS - Fracture Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES127.9 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES131 ft. FS - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES134.1 ft. FM - Fracture Multiple, from 02 to 04 o'clock, within 8 inches of joint: YES138.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"141 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"186.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"189.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"197.9 ft. FM - Fracture Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES200.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES238.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"241.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"286.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"289.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"301.1 ft. FS - Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES338.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"341.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"349.6 ft. CM - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES355.5 ft. CS - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES358.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start370.8 ft. CS - Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES386.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"389.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"404.3 ft. CS - Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES408 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish408 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish410.1 ft. AMH - Downstream Manhole, Survey Ends - 19 0274

Observation photos (21)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    3.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

    9.8 ft. - Fracture Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Deposits Settled Fine,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    19.1 ft. - Deposits Settled Fine, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    19.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 10 %of cross sectional area, Start

    19.1 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start

  • Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

    64.4 ft. - Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    67.4 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 09 to 10 o'clock, within 8 inches of joint: YES

    94.5 ft. - Fracture Spiral, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

    125.1 ft. - Fracture Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

    127.9 ft. - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

    131 ft. - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 02 to 04 o'clock, within 8 inches of joint: YES

    134.1 ft. - Fracture Multiple, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES

    197.9 ft. - Fracture Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    200.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

    301.1 ft. - Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

    349.6 ft. - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

    355.5 ft. - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    358.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

    370.8 ft. - Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

    404.3 ft. - Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

Observations (48)

DistanceCodeObservation
67.4FM
138.1TFA
0AMH19 0275
3.5DAGS
0MGOCONNECTION AT MH 3 O'CLOCK
186.6TFC
47.2TBA
189.7TFA
86.6TFC
127.9FS
197.9FM
404.3CS
65.4TF
0MWM
301.1FS
341.4TFA
349.6CM
125.1FS
370.8CS
358.2DAE
19.1DSF
47.2MWLS
408DAGS
19.1CM
19.1MWLS
94.5FS
141TFC
386.8TF
0MWL
38TFC
389.7TFC
355.5CS
410.1AMH19 0274
89.6TFC
241.6TFC
238.4TFC
64.4CS
338.3TFC
134.1FM
3.4CC
200.9FM
7FM
289.9TF
131FS
9.8FM
286.9TFC
408DAE
47.2DSF

Properties (7)

additional_info
630138080221001
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2021-08-02T01:22:45-07:00
documentation
PROPIPE
is_lateral_inspection
false