Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2021, 09:30 AM
  • 05 1804_05 1803_08102021_024611.mp4

Date
08/10/2021
W/O
906374
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00466
PipeID
P07026
Time
2:30 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9307
Sewer Name
05 JANET LANE TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_906374_TV05329_AUG2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
21 in.
Upstream MH
05 1804
Downstream MH
05 1803
Dir. of Survey
Downstream
Length Surveyed
322 ft.
Total Length
322 ft.
Structural Index
3
Structural Quick
423L
Structural Rating
205
O&M Index
1
O&M Quick
431J
O&M Rating
67
Overall Index
2
Overall Quick
Overall Rating
272
Pipe schematic from manhole 05 1804 to 05 1803
MH: 05 1804MH: 05 1803downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 18040 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.8 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES49.1 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start71 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"71 ft. RBC - Roots Ball Connection, at 10 o'clock, 70 %101.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"110.1 ft. FL - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES177.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.7 ft. RBL - Roots Ball Lateral, at 10 o'clock, 80 %200.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES203.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"203.8 ft. RBL - Roots Ball Lateral, at 10 o'clock, 75 %317.5 ft. FC - Fracture Circumferential, from 01 to 09 o'clock, within 8 inches of joint: YES321.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322 ft. AMH - Downstream Manhole, Survey Ends - 05 1803322 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (13)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    4.8 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    49.1 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    71 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Roots Ball Connection, at 10 o'clock, 70 %

    71 ft. - Roots Ball Connection, at 10 o'clock, 70 %

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    101.1 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    110.1 ft. - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    177.7 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Roots Ball Lateral, at 10 o'clock, 80 %

    177.7 ft. - Roots Ball Lateral, at 10 o'clock, 80 %

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    200.3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    203.7 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

  • Roots Ball Lateral, at 10 o'clock, 75 %

    203.8 ft. - Roots Ball Lateral, at 10 o'clock, 75 %

  • Fracture Circumferential, from 01 to 09 o'clock, within 8 inches of joint: YES

    317.5 ft. - Fracture Circumferential, from 01 to 09 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
101.1TB
317.5FC
4.8FM
322AMH05 1803
71TB
177.7TB
0AMH05 1804
71RBC
0MWL
49.1RFJ
203.7TB
321.9CM
110.1FL
200.3FM
0MWM
203.8RBL
322RFJ
2.5CM
177.7RBL

Properties (7)

additional_info
630074080921202
custom_field_three
FRACTURE MULTIPLE
custom_field_two
2
customer
1
datetime
2021-08-10T02:30:22-07:00
documentation
PROPIPE
is_lateral_inspection
false