Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2021, 08:07 AM
  • 05 1975_J 0182_08162021_012231.mp4

Date
08/16/2021
W/O
906198
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00545
PipeID
P07175
Time
1:07 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9318
Sewer Name
05 9TH STREET CONNECTION TRUNK
City
SAN PEDRO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47A
Purpose
Routine Assessment
Project
RFIR_WO_906198_TV05318_AUG2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
21 in.
Upstream MH
05 1975
Downstream MH
J 0182
Dir. of Survey
Downstream
Length Surveyed
39.5 ft.
Total Length
39.5 ft.
Structural Index
3
Structural Quick
3621
Structural Rating
20
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
28
Pipe schematic from manhole 05 1975 to J 0182
MH: 05 1975MH: J 0182downstream0 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 19750 ft. MWL - Water Level, 5 %of cross sectional area8.6 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES10.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start33.5 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start39.5 ft. AMH - Downstream Manhole, Survey Ends - J 0182 ZOOMED IN39.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish39.5 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Finish39.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish39.5 ft. MGO - General Observation - D/S MH HOLDING BACK FLOW

Observation photos (5)

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    8.6 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start

    31.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  25 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO, Start

    33.5 ft. - Deposits Settled Other, 25 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start

  • Downstream Manhole, Survey Ends - J 0182 ZOOMED IN

    39.5 ft. - Downstream Manhole, Survey Ends - J 0182 ZOOMED IN

Observations (12)

DistanceCodeObservation
39.5AMHJ 0182 ZOOMED IN
31.9DAGS
0MWM
8.6CL
39.5CM
39.5DSZ
0AMH05 1975
10.9CM
39.5DAGS
33.5DSZ
39.5MGOD/S MH HOLDING BACK FLOW
0MWL

Properties (7)

additional_info
630074081621001
custom_field_three
CRACKS/DEBRIS
custom_field_two
3
customer
1
datetime
2021-08-16T01:07:09-07:00
documentation
PROPIPE
is_lateral_inspection
false