Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2021, 05:38 AM
  • 14 0291_14 1130_08092021_225020.mp4

Date
08/09/2021
W/O
906709
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00583
PipeID
P26317
Time
10:38 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9227
Sewer Name
14 TRUNK "F"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_906709_TV14076_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0291
Downstream MH
14 1130
Dir. of Survey
Downstream
Length Surveyed
304.7 ft.
Total Length
304.7 ft.
Structural Index
3
Structural Quick
5I3K
Structural Rating
542
O&M Index
2
O&M Quick
2K00
O&M Rating
120
Overall Index
3
Overall Quick
Overall Rating
662
Pipe schematic from manhole 14 0291 to 14 1130
MH: 14 0291MH: 14 1130downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 02910 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start59 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start301.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish301.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish301.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish301.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish304.7 ft. AMH - Downstream Manhole, Survey Ends - 14 1130304.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE304.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    59 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    304.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
304.7AMH14 1130
2SSS
0MWM
0AMH14 0291
304.7MGOCOCKROACHES IN MANHOLE
304.7MGOCONNECTION AT MH 9 O'CLOCK
0MWL
301.7SAP
2DAGS
301.7SSS
59SRV
7.6SAP
301.7SRV
301.7DAGS

Properties (7)

additional_info
630069080921201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-08-09T22:38:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false