14 0310_14 0309_08102021_033230.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
3.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
29.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
150.8 ft. - Surface Reinforcement Visible, from 08 to 11 o'clock, within 8 inches of joint: YES
189.6 ft. - Surface Reinforcement Visible, from 03 to 05 o'clock, within 8 inches of joint: YES
197.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 14 0310 |
| 189.6 | SRV | — |
| 485.5 | DAGS | — |
| 485.5 | SSS | — |
| 150.8 | SRV | — |
| 0 | MWM | — |
| 2 | DAGS | — |
| 29.5 | SSS | — |
| 487.9 | AMH | 14 0309 |
| 3.8 | SAV | — |
| 485.5 | SAV | — |
| 0 | MWL | — |
| 485.5 | SRV | — |
| 197.6 | SRV | — |