Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2021, 06:57 AM
  • 08 0346_08 DAVIDS_08112021_001820.mp4

Date
08/10/2021
W/O
906377
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00003
PipeID
P23452
Time
11:57 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9310
Sewer Name
08 DAVIDSON CITY TRUNK, SECTS 1,2,&3
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
15
Purpose
Routine Assessment
Project
WO_906377_TV08001_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
08 0346
Downstream MH
08 DAVIDS
Dir. of Survey
Downstream
Length Surveyed
322.5 ft.
Total Length
322.5 ft.
Structural Index
3
Structural Quick
3L2K
Structural Rating
316
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
316
Pipe schematic from manhole 08 0346 to 08 DAVIDS
MH: 08 0346MH: 08 DAVIDSdownstream0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 03464.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start322.5 ft. AMH - Downstream Manhole, Survey Ends - 08 DAVIDS322.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.5 ft. MGO - General Observation - ABANDONED MH322.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    12.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0MGOCONNECTION AT THE MH 9 OC'LOCK
322.5AMH08 DAVIDS
12.7SSS
0MWM
322.5SAP
0MWL
0AMH08 0346
322.5MGOABANDONED MH
4.1SAP
322.5SSS

Properties (7)

additional_info
630074081221202
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-08-10T23:57:39-07:00
documentation
PROPIPE
is_lateral_inspection
false