Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 30, 2017, 04:37 PM
  • 03 0060_03 0059_10302017_094937.mp4

Date
10/30/2017
W/O
0671119
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00366
PipeID
P05081
Time
9:37 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7550
Sewer Name
03 LOS COYOTES DIAGONAL TRUNK
City
LAKEWOOD
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
09
Purpose
Maintenance Related
Project
20171030SHO_LOS_COYOTES_DIAGONAL_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
03 0060
Downstream MH
03 0059
Dir. of Survey
Downstream
Length Surveyed
311.1 ft.
Total Length
311.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
322B
O&M Rating
32
Overall Index
2
Overall Quick
Overall Rating
32
Pipe schematic from manhole 03 0060 to 03 0059
MH: 03 0060MH: 03 0059downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 09500 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MGO - General Observation - ACTIVE DROP CONNECTION @ 9 O CLOCK IN THE MH38.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN56.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES63 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES82.3 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES92.2 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES107.6 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 04 o'clock, , within 8 inches of joint: YES117.7 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES145.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"147.3 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES162.5 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES167.6 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - EVERY JOINT178.4 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish197.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES200.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN222.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - EVERY JOINT238.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish247.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES253 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES268.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES287.9 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES299.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"308.1 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)311.1 ft. MGO - General Observation - ACTIVE DROP CONNECTION @ 9 O CLOCK IN THE MH311.1 ft. AMH - Downstream Manhole, Survey Ends - 1015

Observation photos (15)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock,  , within 8 inches of joint: YES

    56.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock,  , within 8 inches of joint: YES

    63 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    82.3 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    92.2 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 04 o'clock,  , within 8 inches of joint: YES

    107.6 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    117.7 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    147.3 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    162.5 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - EVERY JOINT

    167.6 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - EVERY JOINT

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    197.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - EVERY JOINT

    222.6 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - EVERY JOINT

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    247.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    253 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    268.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    287.9 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

Observations (28)

DistanceCodeObservation
299.2TFA
311.1MGOACTIVE DROP CONNECTION @ 9 O CLOCK IN THE MH
0MWL
178.4DAE
145.9TFA
56.8DAE
0AMH0950
247.5DAE
82.3DAE
222.6DAEEVERY JOINT
147.3DAE
311.1AMH1015
38.9TFOPEN
92.2DAE
238.6DAE
0MWM
268.4DAE
200.3TFOPEN
253DAE
162.5DAE
107.6DAE
287.9DAE
63DAE
117.7DAE
308.1MGOGREASE THROUGHOUT THE REACH (5%)
197.8DAE
167.6DAEEVERY JOINT
0MGOACTIVE DROP CONNECTION @ 9 O CLOCK IN THE MH

Properties (6)

custom_field_three
LOTS OF CALCIUM DEPOSITS
custom_field_two
4
customer
LACSD
datetime
2017-10-30T09:37:57-07:00
documentation
OBREGON, IGNACIO, FRANKLIN, BRAR
is_lateral_inspection
false