16 0417_16 0416_08062021_040906.mp4
4.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
23.3 ft. - Fracture Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES
30.5 ft. - Broken Soil Visible, from 10 to 02 o'clock, within 8 inches of joint: YES
55.9 ft. - Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: NO
112 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start
184.3 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start
350.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS UNDER FLOW
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 16 0416 |
| 158.7 | MWLS | — |
| 0 | MWL | — |
| 350.6 | DAGS | — |
| 4.4 | DAGS | — |
| 212.7 | MWLS | — |
| 62.2 | MWL | — |
| 0 | MWM | — |
| 23.3 | FS | — |
| 112 | MWLS | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 30.5 | BSV | — |
| 225.2 | TFA | — |
| 62.2 | MWM | — |
| 326.5 | TF | — |
| 184.3 | MWLS | — |
| 350.2 | DSZ | DEBRIS UNDER FLOW |
| 126.4 | TFA | — |
| 350.6 | MSA | HARDENED DEPOSITS |
| 55.9 | FS | — |
| 0 | MGO | — |