Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 11, 2018, 11:32 AM
  • Section#10_G 0314_G 0313__9112018__I0066.mp4

Date
09/11/2018
W/O
0727987
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00228
PipeID
P01750
Time
4:32 AM
Certificate
U-1014-0602253
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0066
Sewer Name
G JOINT OUTFALL G- UNIT 9 TRUNK
City
SOUTH GATE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Capital Improvement Program Assesment
Project
20180907MDM_JOINT_OUTFALL_G_UNIT_9_TRUNK
Material
RCP-CTL
Shape
Circular
Height
33 in.
Upstream MH
G 0314
Downstream MH
G 0313
Dir. of Survey
Downstream
Length Surveyed
300.8 ft.
Total Length
300.8 ft.
Structural Index
4
Structural Quick
534K
Structural Rating
255
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
3
Overall Quick
Overall Rating
377
Pipe schematic from manhole G 0314 to G 0313
MH: G 0314MH: G 0313downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:30AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES2 ft. MGO - General Observation - MAG COAT 80% START 8:00 TO 4:002 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - MISSING TILES SLUDGE2 ft. SRC - Surface Reinforcement Corroded, from 09 to 01 o'clock, within 8 inches of joint: NO - BROKEN CIRCUM REBAR2 ft. MGO - General Observation - 90% MISSING TILES START8.7 ft. MGO - General Observation - 80% MISSING TILES START68.5 ft. MGO - General Observation - 20% MISSING TILES START79.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 08 o'clock, , within 8 inches of joint: NO104.3 ft. MGO - General Observation - 100% MISSING TILES 1PIPE JPOINT112.7 ft. MGO - General Observation - 1 NEW MISSING TILE131.9 ft. MGO - General Observation - 100% MISSING TILES 2 PIPE JOINTS133.5 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN CICURM REBAR148.6 ft. MGO - General Observation - 100% MISSING TILES 2 PIPE JOINT176 ft. MGO - General Observation - 90% MISSING TILES 1 PIPE JOINT195.4 ft. MGO - General Observation - 90% MISSING TILES 3 PIPE JOINTS218.8 ft. MGO - General Observation - 90% MISSING TILES 2 PIPE JOINTS235.1 ft. MGO - General Observation - 100% MISSING TILES 2 PIPE JOINTS254.9 ft. MGO - General Observation - 30% MISSING TILES START266.7 ft. MGO - General Observation - 90% MISSING TILES 2 PIPE JOINTS278.1 ft. MGO - General Observation - 90% MISSING TILES START283.8 ft. SRC - Surface Reinforcement Corroded, from 12 to 02 o'clock, within 8 inches of joint: NO - CURCUM REBAR300.2 ft. MGO - General Observation - 90% MISSING TILES FINISH300.2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG AREAS OF MISSING TILES300.2 ft. MGO - General Observation - 80% MAG COAT FINISH300.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - MISSING TILES SLUDGE300.2 ft. MGO - General Observation - MH CONN 9:00 ACTIVE300.8 ft. AMH - Downstream Manhole, Survey Ends - 6:00 AM

Observation photos (13)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES

  • General Observation - MAG COAT 80% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - MISSING TILES SLUDGE

    2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - MISSING TILES SLUDGE

  • Surface Reinforcement Corroded, from 09 to 01 o'clock, within 8 inches of joint: NO - BROKEN CIRCUM REBAR

    2 ft. - Surface Reinforcement Corroded, from 09 to 01 o'clock, within 8 inches of joint: NO - BROKEN CIRCUM REBAR

  • General Observation - 80% MISSING TILES START

    8.7 ft. - General Observation - 80% MISSING TILES START

  • General Observation - 20% MISSING TILES START

    68.5 ft. - General Observation - 20% MISSING TILES START

  • General Observation - 100% MISSING TILES 1PIPE JPOINT

    104.3 ft. - General Observation - 100% MISSING TILES 1PIPE JPOINT

  • General Observation - 1 NEW MISSING TILE

    112.7 ft. - General Observation - 1 NEW MISSING TILE

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN CICURM REBAR

    133.5 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN CICURM REBAR

  • General Observation - 90% MISSING TILES 1 PIPE JOINT

    176 ft. - General Observation - 90% MISSING TILES 1 PIPE JOINT

  • General Observation - 90% MISSING TILES 3 PIPE JOINTS

    195.4 ft. - General Observation - 90% MISSING TILES 3 PIPE JOINTS

  • General Observation - 30% MISSING TILES START

    254.9 ft. - General Observation - 30% MISSING TILES START

  • General Observation - 90% MISSING TILES START

    278.1 ft. - General Observation - 90% MISSING TILES START

Observations (30)

DistanceCodeObservation
2SAMSEVERE AGG AREAS OF MISSING TILES
300.2MGO90% MISSING TILES FINISH
195.4MGO90% MISSING TILES 3 PIPE JOINTS
68.5MGO20% MISSING TILES START
0MWM
300.2SAMSEVERE AGG AREAS OF MISSING TILES
104.3MGO100% MISSING TILES 1PIPE JPOINT
283.8SRCCURCUM REBAR
112.7MGO1 NEW MISSING TILE
300.2MGO80% MAG COAT FINISH
176MGO90% MISSING TILES 1 PIPE JOINT
148.6MGO100% MISSING TILES 2 PIPE JOINT
0AMH5:30AM
300.8AMH6:00 AM
0MWL
254.9MGO30% MISSING TILES START
266.7MGO90% MISSING TILES 2 PIPE JOINTS
278.1MGO90% MISSING TILES START
300.2DSZMISSING TILES SLUDGE
2MGOMAG COAT 80% START 8:00 TO 4:00
8.7MGO80% MISSING TILES START
235.1MGO100% MISSING TILES 2 PIPE JOINTS
300.2MGOMH CONN 9:00 ACTIVE
2DSZMISSING TILES SLUDGE
2SRCBROKEN CIRCUM REBAR
79.7DAGS
133.5SRCBROKEN CICURM REBAR
218.8MGO90% MISSING TILES 2 PIPE JOINTS
131.9MGO100% MISSING TILES 2 PIPE JOINTS
2MGO90% MISSING TILES START

Properties (6)

custom_field_three
BROKEN CORRODED CIRCUM REBAR
custom_field_two
2
customer
LACSD
datetime
2018-09-11T04:32:18-07:00
documentation
MARTIN,REVELES,OLIVER 111,YOUNG
is_lateral_inspection
false