Section#6_G 0318_G 0317__9112018__I0065.mp4
2 ft. - General Observation - 90% MISSING TILES 1 PIPE JOINT
2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - MISSING TILES & SLUDGE
2.2 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBARLONG &
5.7 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - LONG & CIRCUM REBAR
5.7 ft. - General Observation - 50% MISSING TILES START
25.8 ft. - General Observation - 90% MISSING TILES 2 PIPE JOINTS
30.8 ft. - Surface Reinforcement Corroded, from 12 to 02 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
41.2 ft. - General Observation - 5% MISSING TILES START
56.1 ft. - General Observation - 100% MISSING TILES 1 PIPE JOINT
57.8 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
73.1 ft. - General Observation - NEW MISSING TILES 1 PIPE JOINT
78.1 ft. - General Observation - 90% MISSING TILES START
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | MH CONN 3:00 ACTIVE |
| 5.7 | SRC | LONG & CIRCUM REBAR |
| 56.1 | MGO | 100% MISSING TILES 1 PIPE JOINT |
| 0 | MWM | — |
| 41.2 | MGO | 5% MISSING TILES START |
| 25.8 | MGO | 90% MISSING TILES 2 PIPE JOINTS |
| 0 | MWL | — |
| 0 | AMH | 3:10AM |
| 95.8 | AMH | 3:25AM |
| 95.1 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 61.5 | SRC | LONG CIRCUM REBAR |
| 2.2 | SAM | SEVERE AGG AREAS OF MISSING TILES |
| 5.7 | MGO | 50% MISSING TILES START |
| 73.1 | MGO | NEW MISSING TILES 1 PIPE JOINT |
| 95.1 | MGO | MH CONN 9:00 ACTIVE |
| 57.8 | SRC | LONG CIRCUM REBAR |
| 2.2 | SRC | CIRCUM REBARLONG & |
| 1 | DAGS | INSIDE MH |
| 2 | MGO | 90% MISSING TILES 1 PIPE JOINT |
| 30.8 | SRC | CIRCUM REBAR |
| 2 | DSZ | MISSING TILES & SLUDGE |
| 78.1 | MGO | 90% MISSING TILES START |
| 95.1 | DSZ | MISSING TILES SLUDGE |
| 95.1 | MGO | 90% MISSING TILES FINISH |