Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2021, 07:00 AM
  • 08 0347_08 0346_08112021_000820.mp4

Date
08/11/2021
W/O
906744
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00003
PipeID
P00396
Time
12:00 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9311
Sewer Name
08 DAVIDSON CITY TRUNK, SECTS 1,2,&3
City
CARSON
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
15
Purpose
Routine Assessment
Project
WO_906744_TV08104_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
08 0347
Downstream MH
08 0346
Dir. of Survey
Downstream
Length Surveyed
28.9 ft.
Total Length
28.9 ft.
Structural Index
3
Structural Quick
5535
Structural Rating
50
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
50
Pipe schematic from manhole 08 0347 to 08 0346
MH: 08 0347MH: 08 0346downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 03470 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.9 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK28.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish28.9 ft. AMH - Downstream Manhole, Survey Ends - 08 034628.9 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish28.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
28.9MGOCONNECTION AT THE MH 9 OC'LOCK
2.3SAP
2.3SRV
0AMH08 0347
28.9SSS
2.3SSS
28.9AMH08 0346
28.9SRV
0MWL
28.9SAP
0MWM

Properties (7)

additional_info
630074081021203
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-08-11T00:00:53-07:00
documentation
PROPIPE
is_lateral_inspection
false