Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2021, 08:44 AM
  • 08 0338_08 0337_08112021_015230.mp4

Date
08/11/2021
W/O
906744
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00003
PipeID
P00388
Time
1:44 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9311
Sewer Name
08 DAVIDSON CITY TRUNK, SECTS 1,2,&3
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
14
Purpose
Routine Assessment
Project
WO_906744_TV08104_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
12 in.
Upstream MH
08 0338
Downstream MH
08 0337
Dir. of Survey
Downstream
Length Surveyed
304.2 ft.
Total Length
304.2 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
300
Pipe schematic from manhole 08 0338 to 08 0337
MH: 08 0338MH: 08 0337downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 03383.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"220.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"228.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"267.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"296.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"304.2 ft. AMH - Downstream Manhole, Survey Ends - 08 0337304.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish304.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
296.4TF
220.3TF
304.2AMH08 0337
3.9SAP
3.9SSS
0MWM
0MWL
304.2SSS
267.7TF
228.3TF
304.2SAP
0AMH08 0338
26.7TF

Properties (7)

additional_info
630074081021203
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-08-11T01:44:13-07:00
documentation
PROPIPE
is_lateral_inspection
false