Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2021, 09:36 AM
  • 08 0335_08 0334_08112021_024626.mp4

Date
08/11/2021
W/O
906744
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00003
PipeID
P00385
Time
2:36 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9311
Sewer Name
08 DAVIDSON CITY TRUNK, SECTS 1,2,&3
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
14
Purpose
Routine Assessment
Project
WO_906744_TV08104_AUG2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
12 in.
Upstream MH
08 0335
Downstream MH
08 0334
Dir. of Survey
Downstream
Length Surveyed
350.8 ft.
Total Length
350.8 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
345
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
345
Pipe schematic from manhole 08 0335 to 08 0334
MH: 08 0335MH: 08 0334downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 03350 ft. MWL - Water Level, 15 %of cross sectional area4.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"4.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start105.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"175.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"350.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish350.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish350.8 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK350.8 ft. AMH - Downstream Manhole, Survey Ends - 08 0334

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MWM
175.8TFA
350.8SSS
4.2TF
4.2SAP
0AMH08 0335
0MWL
350.8SAP
350.8MGOCONNECTION AT THE MH 3 OC'LOCK
350.8AMH08 0334
105.7TF
4.2SSS

Properties (7)

additional_info
630074081021203
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-08-11T02:36:32-07:00
documentation
PROPIPE
is_lateral_inspection
false