- Date
- 07/21/2021
- W/O
- 901521
- Weather
- Dry
- Operator/Surveyor
- M.MARTINEZ
- Sewer ID
- Z00941
- PipeID
- P11135
- Time
- 3:17 AM
- Certificate
- U-115-06022794
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- K8698
- Sewer Name
- H JOINT OUTFALL H - UNIT 9B
- City
- LA PUENTE
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 15
- Page No.
- 30
- Purpose
- Routine Assessment
- Project
- RFIR_WO_901521_TV22077_JUL2021
- Sewer Type
- Gravity
- Material
- NRCP
- Shape
- Circular
- Height
- 28 in.
- Width
- 28 in.
- Upstream MH
- H 0726
- Downstream MH
- H 0725
- Dir. of Survey
- Downstream
- Length Surveyed
- 816.5 ft.
- Total Length
- 816.5 ft.
- Structural Index
- 3
- Structural Quick
- 3`2`
- Structural Rating
- 815
- O&M Index
- 2
- O&M Quick
- 4B3G
- O&M Rating
- 498
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 1313
Pipe schematic from manhole H 0726 to H 0725 Observation photos (6)

2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

2 ft. - General Observation - 60% MAG COAT

7.2 ft. - Obstacles Other, 10 %of cross sectional area, at 06 o'clock - DEBRIS

615.6 ft. - Deposits Settled Fine, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

754 ft. - Alignment Left, 40 %, Start