Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2021, 06:13 AM
  • H 0724_H 0723_07212021_233134.mp4

Date
07/21/2021
W/O
901521
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00941
PipeID
P11133
Time
11:13 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9083
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
LA PUENTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_901521_TV22077_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0724
Downstream MH
H 0723
Dir. of Survey
Downstream
Length Surveyed
559.1 ft.
Total Length
559.1 ft.
Structural Index
3
Structural Quick
3U2U
Structural Rating
555
O&M Index
2
O&M Quick
412U
O&M Rating
226
Overall Index
2
Overall Quick
Overall Rating
781
Pipe schematic from manhole H 0724 to H 0723
MH: H 0724MH: H 0723downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 07242 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - 65% MAG COAT556.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish557 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish557 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish559.1 ft. AMH - Downstream Manhole, Survey Ends - H 0723

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 65% MAG COAT

    2.6 ft. - General Observation - 65% MAG COAT

Observations (11)

DistanceCodeObservation
2.6SSS
557SAV
0MWM
2DAGS
2.6MGO65% MAG COAT
0MWL
0AMHH 0724
557DAGS
556.7SSS
2SAV
559.1AMHH 0723

Properties (6)

custom_field_three
SPALLING, MAG COAT
custom_field_two
3
customer
1
datetime
2021-07-21T23:13:44-07:00
documentation
PRO PIPE
is_lateral_inspection
false