Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2021, 07:04 AM
  • H 0723_H 0722_07222021_003032.mp4

Date
07/22/2021
W/O
901521
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00941
PipeID
P11132
Time
12:04 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9083
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
LA PUENTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_901521_TV22077_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0723
Downstream MH
H 0722
Dir. of Survey
Downstream
Length Surveyed
661.3 ft.
Total Length
661.3 ft.
Structural Index
3
Structural Quick
3Y2W
Structural Rating
637
O&M Index
4
O&M Quick
4C22
O&M Rating
76
Overall Index
3
Overall Quick
Overall Rating
713
Pipe schematic from manhole H 0723 to H 0722
MH: H 0723MH: H 0722downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 07230 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT50.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start457.3 ft. LR - Alignment Right, 30 %, Start544.2 ft. LR - Alignment Right, 30 %, Finish659 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish659 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish659.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish661.3 ft. AMH - Downstream Manhole, Survey Ends - H 0722

Observation photos (3)

  • General Observation - 65% MAG COAT

    2 ft. - General Observation - 65% MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    50.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Right, 30 %, Start

    457.3 ft. - Alignment Right, 30 %, Start

Observations (13)

DistanceCodeObservation
2SAV
661.3AMHH 0722
0AMHH 0723
2DAGS
659.2SSS
2MGO65% MAG COAT
50.8SSS
457.3LR
0MWM
659DAGS
544.2LR
0MWL
659SAV

Properties (6)

custom_field_three
SPALLING, MAG COAT
custom_field_two
3
customer
1
datetime
2021-07-22T00:04:53-07:00
documentation
PRO PIPE
is_lateral_inspection
false