Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 16, 2021, 09:07 AM
  • H 0747_H 0746A_07162021_032826.mp4

Date
07/16/2021
W/O
901521
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00941
PipeID
P23488
Time
2:07 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9000
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_901521_TV22077_JUL2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
22 in.
Width
22 in.
Upstream MH
H 0747
Downstream MH
H 0746A
Dir. of Survey
Downstream
Length Surveyed
783.4 ft.
Total Length
783.4 ft.
Structural Index
3
Structural Quick
3]2^
Structural Rating
761
O&M Index
2
O&M Quick
2^00
O&M Rating
312
Overall Index
2
Overall Quick
Overall Rating
1073
Pipe schematic from manhole H 0747 to H 0746A
MH: H 0747MH: H 0746Adownstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 07470 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 60% MAG COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start771.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish771.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish781 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish783.4 ft. AMH - Downstream Manhole, Survey Ends - H 0746A

Observation photos (3)

  • General Observation - 60% MAG COAT

    2 ft. - General Observation - 60% MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2DAGS
2MGO60% MAG COAT
783.4AMHH 0746A
14.4SAV
771.3SAV
781DAGS
0MWM
2SSS
0AMHH 0747
0MWL
771.3SSS

Properties (6)

custom_field_three
AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2021-07-16T02:07:06-07:00
documentation
PRO PIPE
is_lateral_inspection
false